{"id":723,"date":"2012-04-03T18:25:47","date_gmt":"2012-04-03T18:25:47","guid":{"rendered":"http:\/\/meri.njmeadowlands.gov\/mesic\/?page_id=723"},"modified":"2018-08-06T20:49:00","modified_gmt":"2018-08-06T20:49:00","slug":"berrys-creek-marsh-2","status":"publish","type":"page","link":"https:\/\/meri.njmeadowlands.gov\/mesic\/sites\/candidate-restoration-sites\/berrys-creek-marsh-2\/","title":{"rendered":"Berry&#8217;s Creek Marsh"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1483\" src=\"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/01\/BerrysCreekMarsh-232x300.jpg\" alt=\"BerrysCreekMarsh\" width=\"331\" height=\"428\" srcset=\"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/01\/BerrysCreekMarsh-232x300.jpg 232w, https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/01\/BerrysCreekMarsh-791x1024.jpg 791w, https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/01\/BerrysCreekMarsh.jpg 1224w\" sizes=\"auto, (max-width: 331px) 100vw, 331px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1556\" src=\"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2012\/04\/IMG_0313-View-NE-across-Berrys-Creek-marsh-300x225.jpg\" alt=\"IMG_0313 View NE across Berry's Creek marsh\" width=\"547\" height=\"411\" srcset=\"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2012\/04\/IMG_0313-View-NE-across-Berrys-Creek-marsh-300x225.jpg 300w, https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2012\/04\/IMG_0313-View-NE-across-Berrys-Creek-marsh-1024x768.jpg 1024w\" sizes=\"auto, (max-width: 547px) 100vw, 547px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Category<\/strong>: Candidate Restoration\/Preservation Site<\/p>\n<p><strong>Location<\/strong>: East of the Meadowlands Corporate Center and southwest of Oritani Marsh and the New Jersey Transit &#8211; Bergen Line in Rutherford, Bergen County<\/p>\n<p><strong>Latitude\/Longitude<\/strong>: 40.80145\/-74.08913<\/p>\n<p><strong>Current Land Use<\/strong>: Tidal marsh<\/p>\n<p><strong>Size<\/strong>: 85 acres<\/p>\n<p><strong>Current Ownership<\/strong>: NJMC<\/p>\n<p><strong>Site Description<\/strong>: Berry&#8217;s Creek Marsh is an undeveloped area most of which (70.4 acres) is landlocked between the NJ Transit Bergen railroad line and the old Rutherford landfill haul road. \u00a0This marsh is dominated by common reed (<em>Phragmites australis<\/em>). Fish Creek meanders through the marsh. \u00a0Approximately 40 acres within this site is occupied by the WOR radio tower array. \u00a0Two parcels, totaling approximately 14.6 acres, lie between Berry&#8217;s Creek and the old Rutherford landfill haul road. \u00a0The southernmost of these two parcels abuts the EnCap wetland mitigation site.<\/p>\n<h3>Existing Site-Specific Data Inventory<\/h3>\n<p><strong>A. Survey, Maps, and GIS<\/strong><\/p>\n<p>HMD regional data exists inclusive of this site. Topographic information collected for a portion of the site in 2001.<\/p>\n<p><strong>B. Real Estate\/Ownership<\/strong><\/p>\n<p>Owned by NJMC. Acquisition data available on the NJMC website.<\/p>\n<p><strong>C. Site History &amp; Land Use<\/strong><\/p>\n<p>No data obtained.<\/p>\n<p><strong>D. Biological Studies &#8211; Fauna<\/strong><\/p>\n<p>General baseline data collected in 1988, site-specific data collected in 1985, 1992 and 2001.<\/p>\n<p><strong>E. Biological Studies &#8211; General Environmental<\/strong><\/p>\n<p>Baseline data and wetland quality assessments conducted in 1988 and 1992, and in 2001 for a portion of the site.<\/p>\n<p><strong>F. Geotechnical<\/strong><\/p>\n<p>General baseline data collected in 1988, site-specific data collected in 1985, 1992 and 2001.<\/p>\n<p><strong>G. Hydraulics and Hydrology<\/strong><\/p>\n<p>Baseline data collected in 1988, site-specific data collected in 1985, 1992 and 2001.<\/p>\n<p><strong>H. Water and Sediments<\/strong><\/p>\n<p>Site-specific water and sediment contamination data collected in 1980 and 1985.<\/p>\n<p><strong>I. Historical\/Cultural Resources<\/strong><\/p>\n<p>Site-specific baseline data collected in 2001.<\/p>\n<p><strong>J. Restoration\/Remediation Design Plans<\/strong><\/p>\n<p>Final wetland mitigation plan developed in 2001.<\/p>\n<h2>Site Reports<\/h2>\n<h3><strong>Site #12 \u2013 Berry\u2019s Creek Marsh<\/strong><\/h3>\n<p><strong>Category<\/strong>: Candidate Restoration\/Preservation Site<\/p>\n<p><strong>Location<\/strong>: East of the Meadowlands Corporate Center and southwest of Oritani Marsh and the New Jersey Transit \u2013 Bergen Line in Rutherford, Bergen County<\/p>\n<p><strong>Latitude\/Longitude<\/strong>: 40.80145 \/ -74.08913<\/p>\n<p><strong>Current Land Use<\/strong>: Tidal marsh<\/p>\n<p><strong>Size<\/strong>: 85 acres<\/p>\n<p><strong>Current Ownership<\/strong>: NJMC<\/p>\n<p><strong>Site Description<\/strong>:\u00a0Berry&#8217;s Creek Marsh is an undeveloped area most of which (70.4 acres) is landlocked between the NJ Transit Bergen railroad line and the old Rutherford landfill haul road. \u00a0This marsh is dominated by common reed (<em>Phragmites australis<\/em>). Fish Creek meanders through the marsh. \u00a0Approximately 40 acres within this site is occupied by the WOR radio tower array. \u00a0Two parcels, totaling approximately 14.6 acres, lie between Berry&#8217;s Creek and the old Rutherford landfill haul road. \u00a0The southernmost of these two parcels abuts the EnCap wetland mitigation site.<\/p>\n<p><strong>Existing Site Specific Data Inventory<\/strong><\/p>\n<p>* \u2013 Report repeated under multiple data categories and\/or sites.<\/p>\n<p><strong>A.\u00a0 Survey, Maps, and GIS<\/strong><\/p>\n<p>Relevant survey, mapping, and GIS data for the Meadowlands can be found in the Meadowlands-wide site report under data category A.<\/p>\n<p>1.\u00a0\u00a0\u00a0\u00a0\u00a0 <strong>*Paulus, Sokolowski, and Sartor, LLC. Final Wetlands Mitigation Plan for EnCap Golf Holdings, LLC and the New Jersey Meadowlands Commission: Brownfield Redevelopment Project. June 2001 (Revised May 2002).<\/strong> <strong><sup>[1]<\/sup> <\/strong>Outlines the final wetland mitigation plan for Lyndhurst, Avon, and Rutherford Landfills. The mitigation area is located in Berry\u2019s Creek Marsh. The report provides a description of wetlands to be impacted at the three landfills, as well as a description of existing conditions of the mitigation site including topography, soils and surficial geology, hydrology, vegetation, fish and wildlife, and historic resources. The report also contains IVA assessments for both the existing wetlands and the proposed mitigation wetlands, a detailed wetlands mitigation plan, and maintenance and monitoring plan.<\/p>\n<p><strong>B.\u00a0\u00a0 Real Estate\/Ownership<\/strong><\/p>\n<p>Berry\u2019s Creek Marsh is owned by NJMC.<\/p>\n<p>2.\u00a0\u00a0\u00a0\u00a0\u00a0 <strong>NJMC. Berry\u2019s Creek Marsh Acquisition Information. September 2003.<\/strong><\/p>\n<p>Date of Acquisition:\u00a0\u00a0\u00a0 November 22, 1999<\/p>\n<p>Cost of Acquisition:\u00a0\u00a0\u00a0\u00a0 $1,181,996.84<\/p>\n<p>Acquired from:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Rutherford Land Company<\/p>\n<p><strong>C.\u00a0 Site History &amp; Land Use<\/strong><\/p>\n<p>No data obtained.<\/p>\n<p><strong>D.\u00a0 Biological Studies \u2013 Fauna<\/strong><\/p>\n<p>3.\u00a0\u00a0\u00a0\u00a0\u00a0 <strong>*Paulus, Sokolowski, and Sartor, LLC. Final Wetlands Mitigation Plan for EnCap Golf Holdings, LLC and the New Jersey Meadowlands Commission: Brownfield Redevelopment Project. June 2001 (Revised May 2002).<\/strong> <strong><sup>[1]<\/sup> <\/strong>Outlines the final wetland mitigation plan for Lyndhurst, Avon, and Rutherford Landfills. The mitigation area is located in Berry\u2019s Creek Marsh. The report provides a description of wetlands to be impacted at the three landfills, as well as a description of existing conditions of the mitigation site including topography, soils and surficial geology, hydrology, vegetation, fish and wildlife, and historic resources. The report also contains IVA assessments for both the existing wetlands and the proposed mitigation wetlands, a detailed wetlands mitigation plan, and maintenance and monitoring plan.<\/p>\n<p>4.\u00a0\u00a0\u00a0\u00a0\u00a0 <strong>*U.S. Coast Guard &amp; USACE. Draft Environmental Impact Statement and Section 404 (b)(1) Evaluation \u2013 New Jersey Turnpike Widening Project: Interchange 11 to U.S. Route 46. New Jersey Turnpike Authority. 1988. <\/strong><strong><sup>[1a]<\/sup><\/strong>States project purpose and need, alternatives, affected environment, and environmental consequences.<\/p>\n<p><strong>E.\u00a0\u00a0 Biological Studies \u2013 General Environmental<\/strong><\/p>\n<p>5.\u00a0\u00a0\u00a0\u00a0\u00a0 <strong>Environmental Concern, Inc. A Quantitative Comparison of the Proposed Wetland Mitigation Site and Impacted Site (C &amp; F Realty, Ltd.\/ Berry Creek Distribution Center). April 1992. <sup>[4]<\/sup> <\/strong>The purpose of this report is to evaluate the wetland functions lost through impacts at the Berry Creek Distribution Center Development Site in Carlstadt, NJ and to compare them to the functions that will be gained through the proposed mitigation project located in Lyndhurst, NJ. The three approaches used were: 1) the Habitat Evaluation Procedure; 2) the Wetland Replacement Evaluation Procedure; and 3) literature validation.<\/p>\n<p>6.\u00a0\u00a0\u00a0\u00a0\u00a0 <strong>*ERM-Southeast, Inc., Task I: Berrys Creek Study Volume I Nature of the Problem. October 1985.<sup>[1]<\/sup><\/strong> This report includes site specific literature search and background investigation, site description, and describes the nature of the problem. Summarized in Volume I are all analytical data specific to the Berrys Creek area and the Wood-Ridge site. This report details, chemical contamination, of the site, surface water, mercury in the air and groundwater.<\/p>\n<p>7.\u00a0\u00a0\u00a0\u00a0\u00a0 <strong>*Paulus, Sokolowski, and Sartor, LLC. Final Wetlands Mitigation Plan for EnCap Golf Holdings, LLC and the New Jersey Meadowlands Commission: Brownfield Redevelopment Project. June 2001 (Revised May 2002).<\/strong> <strong><sup>[1]<\/sup> <\/strong>Outlines the final wetland mitigation plan for Lyndhurst, Avon, and Rutherford Landfills. The mitigation area is located in Berry\u2019s Creek Marsh. The report provides a description of wetlands to be impacted at the three landfills, as well as a description of existing conditions of the mitigation site including topography, soils and surficial geology, hydrology, vegetation, fish and wildlife, and historic resources. The report also contains IVA assessments for both the existing wetlands and the proposed mitigation wetlands, a detailed wetlands mitigation plan, and maintenance and monitoring plan.<\/p>\n<p>8.\u00a0\u00a0\u00a0\u00a0\u00a0 <strong>*U.S. Coast Guard &amp; USACE. Draft Environmental Impact Statement and Section 404 (b)(1) Evaluation \u2013 New Jersey Turnpike Widening Project: Interchange 11 to U.S. Route 46. New Jersey Turnpike Authority. 1988. <\/strong><strong><sup>[1a]<\/sup><\/strong>States project purpose and need, alternatives, affected environment, and environmental consequences.<\/p>\n<p><strong>F.\u00a0\u00a0 Geotechnical <\/strong><\/p>\n<p>9.\u00a0\u00a0\u00a0\u00a0\u00a0 <strong>*Paulus, Sokolowski, and Sartor, LLC. Final Wetlands Mitigation Plan for EnCap Golf Holdings, LLC and the New Jersey Meadowlands Commission: Brownfield Redevelopment Project. June 2001 (Revised May 2002).<\/strong> <strong><sup>[1]<\/sup> <\/strong>Outlines the final wetland mitigation plan for Lyndhurst, Avon, and Rutherford Landfills. The mitigation area is located in Berry\u2019s Creek Marsh. The report provides a description of wetlands to be impacted at the three landfills, as well as a description of existing conditions of the mitigation site including topography, soils and surficial geology, hydrology, vegetation, fish and wildlife, and historic resources. The report also contains IVA assessments for both the existing wetlands and the proposed mitigation wetlands, a detailed wetlands mitigation plan, and maintenance and monitoring plan.<\/p>\n<p>10.\u00a0 <strong>*U.S. Coast Guard &amp; USACE. Draft Environmental Impact Statement and Section 404 (b)(1) Evaluation \u2013 New Jersey Turnpike Widening Project: Interchange 11 to U.S. Route 46. New Jersey Turnpike Authority. 1988. <\/strong><strong><sup>[1a]<\/sup><\/strong>States project purpose and need, alternatives, affected environment, and environmental consequences.<\/p>\n<p><strong>G.\u00a0 Hydraulics and Hydrology<\/strong><\/p>\n<p>11.\u00a0 <strong>*Paulus, Sokolowski, and Sartor, LLC. Final Wetlands Mitigation Plan for EnCap Golf Holdings, LLC and the New Jersey Meadowlands Commission: Brownfield Redevelopment Project. June 2001 (Revised May 2002).<\/strong> <strong><sup>[1]<\/sup> <\/strong>Outlines the final wetland mitigation plan for Lyndhurst, Avon, and Rutherford Landfills. The mitigation area is located in Berry\u2019s Creek Marsh. The report provides a description of wetlands to be impacted at the three landfills, as well as a description of existing conditions of the mitigation site including topography, soils and surficial geology, hydrology, vegetation, fish and wildlife, and historic resources. The report also contains IVA assessments for both the existing wetlands and the proposed mitigation wetlands, a detailed wetlands mitigation plan, and maintenance and monitoring plan.<\/p>\n<p>12.\u00a0 <strong>*U.S. Coast Guard &amp; USACE. Draft Environmental Impact Statement and Section 404 (b)(1) Evaluation \u2013 New Jersey Turnpike Widening Project: Interchange 11 to U.S. Route 46. New Jersey Turnpike Authority. 1988. <\/strong><strong><sup>[1a]<\/sup><\/strong>States project purpose and need, alternatives, affected environment, and environmental consequences.<\/p>\n<p><strong>H.\u00a0 Water and Sediments<\/strong><\/p>\n<p>13.\u00a0 <strong>*ERM-Southeast, Inc., Task I: Berrys Creek Study Volume I Nature of the Problem. October 1985.<sup>[1]<\/sup><\/strong> This report includes site specific literature search and background investigation, site description, and describes the nature of the problem. Summarized in Volume I are all analytical data specific to the Berrys Creek area and the Wood-Ridge site. This report details, chemical contamination, of the site, surface water, mercury in the air and groundwater.<\/p>\n<p>14.\u00a0 <strong>Galluzzi, Paul. Guidelines for Environmental Assessments of Channel and Marsh Sediment Disturbances in the Berrys Creek Drainage. April 1980. <sup>[1]<\/sup><\/strong> Based on data from the 1977-1978 Mercury Study which indicates the highest mercury contamination exists in these upper Berrys Creek Marshes; the mercury dump site is less than 2000 feet north of the subject inquiries. Also there is a lot of evidence that mercury is only one of several heavy metals present in high concentrations in marsh sediments.<\/p>\n<p>15.\u00a0 <strong>*U.S. Coast Guard &amp; USACE. Draft Environmental Impact Statement and Section 404 (b)(1) Evaluation \u2013 New Jersey Turnpike Widening Project: Interchange 11 to U.S. Route 46. New Jersey Turnpike Authority. 1988. <\/strong><strong><sup>[1a]<\/sup><\/strong>States project purpose and need, alternatives, affected environment, and environmental consequences.<\/p>\n<p><strong>I.\u00a0\u00a0\u00a0 Historical\/Cultural Resources<\/strong><\/p>\n<p>16.\u00a0 <strong>*Paulus, Sokolowski, and Sartor, LLC. Final Wetlands Mitigation Plan for EnCap Golf Holdings, LLC and the New Jersey Meadowlands Commission: Brownfield Redevelopment Project. June 2001 (Revised May 2002).<\/strong> <strong><sup>[1]<\/sup> <\/strong>Outlines the final wetland mitigation plan for Lyndhurst, Avon, and Rutherford Landfills. The mitigation area is located in Berry\u2019s Creek Marsh. The report provides a description of wetlands to be impacted at the three landfills, as well as a description of existing conditions of the mitigation site including topography, soils and surficial geology, hydrology, vegetation, fish and wildlife, and historic resources. The report also contains IVA assessments for both the existing wetlands and the proposed mitigation wetlands, a detailed wetlands mitigation plan, and maintenance and monitoring plan.<\/p>\n<p><strong>J.\u00a0\u00a0 Restoration\/Remediation Design Plans<\/strong><\/p>\n<p>17.\u00a0 <strong>*Paulus, Sokolowski, and Sartor, LLC. Final Wetlands Mitigation Plan for EnCap Golf Holdings, LLC and the New Jersey Meadowlands Commission: Brownfield Redevelopment Project. June 2001 (Revised May 2002).<\/strong> <strong><sup>[1]<\/sup> <\/strong>Outlines the final wetland mitigation plan for Lyndhurst, Avon, and Rutherford Landfills. The mitigation area is located in Berry\u2019s Creek Marsh. The report provides a description of wetlands to be impacted at the three landfills, as well as a description of existing conditions of the mitigation site including topography, soils and surficial geology, hydrology, vegetation, fish and wildlife, and historic resources. The report also contains IVA assessments for both the existing wetlands and the proposed mitigation wetlands, a detailed wetlands mitigation plan, and maintenance and monitoring plan.<\/p>\n<p><b>K. Bibliographic Updates\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/b><\/p>\n<p>Site #12: <a href=\"http:\/\/meriverso.njmeadowlands.gov\/iluminar\/home.asp?cuid=merinj&amp;lid=merinj&amp;kw=Berry%60s+Creek+Marsh\">Berry&#8217;s Creek Marsh<\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Category: Candidate Restoration\/Preservation Site Location: East of the Meadowlands Corporate Center and southwest of Oritani Marsh and the New Jersey Transit &#8211; Bergen Line in Rutherford, Bergen County Latitude\/Longitude: 40.80145\/-74.08913 Current Land Use: Tidal marsh Size: 85 acres Current Ownership: NJMC Site Description: Berry&#8217;s Creek Marsh is an undeveloped area most of which (70.4 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":55,"menu_order":12,"comment_status":"open","ping_status":"open","template":"","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"class_list":["post-723","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/pages\/723","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/comments?post=723"}],"version-history":[{"count":9,"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/pages\/723\/revisions"}],"predecessor-version":[{"id":1647,"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/pages\/723\/revisions\/1647"}],"up":[{"embeddable":true,"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/pages\/55"}],"wp:attachment":[{"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/media?parent=723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}