{"id":1439,"date":"2015-02-13T17:51:31","date_gmt":"2015-02-13T17:51:31","guid":{"rendered":"http:\/\/meri.njmeadowlands.gov\/mesic\/?page_id=1439"},"modified":"2018-08-02T18:09:00","modified_gmt":"2018-08-02T18:09:00","slug":"mri-phase-3-wetland-mitigation-bank","status":"publish","type":"page","link":"https:\/\/meri.njmeadowlands.gov\/mesic\/sites\/existing-restoration-preservation-mitigation-sites\/mri-phase-3-wetland-mitigation-bank\/","title":{"rendered":"MRI Phase 3 Wetland Mitigation Bank"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><strong><a href=\"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/02\/IMG_3258-View-East-across-MRI3-from-Bashes-Creek.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1548\" src=\"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/02\/IMG_3258-View-East-across-MRI3-from-Bashes-Creek-300x225.jpg\" alt=\"IMG_3258 View East across MRI3 from Bashes Creek\" width=\"420\" height=\"315\" srcset=\"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/02\/IMG_3258-View-East-across-MRI3-from-Bashes-Creek-300x225.jpg 300w, https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/02\/IMG_3258-View-East-across-MRI3-from-Bashes-Creek-1024x768.jpg 1024w\" sizes=\"auto, (max-width: 420px) 100vw, 420px\" \/><\/a>\u00a0 \u00a0 \u00a0<\/strong><strong>MRI Phase 3 Mitigation Bank<\/strong><\/p>\n<p><a href=\"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/02\/IMG_3288-Global-mitigation-site-from-Moonachie-Creek.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1549\" src=\"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/02\/IMG_3288-Global-mitigation-site-from-Moonachie-Creek-300x225.jpg\" alt=\"IMG_3288 Global mitigation site, from Moonachie Creek\" width=\"415\" height=\"311\" srcset=\"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/02\/IMG_3288-Global-mitigation-site-from-Moonachie-Creek-300x225.jpg 300w, https:\/\/meri.njmeadowlands.gov\/mesic\/wp-content\/uploads\/2015\/02\/IMG_3288-Global-mitigation-site-from-Moonachie-Creek-1024x768.jpg 1024w\" sizes=\"auto, (max-width: 415px) 100vw, 415px\" \/><\/a>\u00a0 \u00a0 \u00a0<strong>Global Terminal &amp; Container Services Mitigation Site<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>A. \u00a0 \u00a0 \u00a0MRI Phase 3 Wetland Mitigation Bank and Global Terminal &amp; Container Services, LLC Mitigation Site<\/strong><strong>\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0<\/strong><\/p>\n<p><strong>Category: <\/strong>Existing Restoration\/Preservation and\/or Mitigation Site<\/p>\n<p><strong>Location: <\/strong>Bounded on the north by the Transco pipeline, on the south by the Hackensack River, on the west by Bashes Creek, and on the east Transco\u2019s Station 240 LNG facility.\u00a0 The MRI Phase 3 wetland mitigation bank lies between Bashes and Moonachie Creeks.\u00a0 The Global wetland mitigation site is between Moonachie Creek and the uplands of the Transco Station 240 LNG facility.<\/p>\n<p><strong>Latitude\/Longitude:<\/strong> 40.81110 \/ -74.05496<\/p>\n<p><strong>Current Land Use: <\/strong>Tidal Wetland Mitigation Bank and Wetland Mitigation Site<\/p>\n<p><strong>Size: <\/strong>67 acres total; MRI Phase 3 Mitigation Bank is 51 acres.\u00a0 The adjacent Global mitigation site is 16 acres.<\/p>\n<p><strong>Current Ownership: <\/strong>Transcontinental Gas Pipe Line Company (Transco) and Evergreen Environmental, LLC (Lot 5)<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Site Description: <\/strong>Prior to restoration, this site was a <em>Phragmites<\/em>-dominated freshwater wetland that was cut-off from tidal flow due to a riverfront dike and a tide gate near the mouth of Moonachie Creek that were constructed by the Bergen County Mosquito Commission circa 1934.\u00a0 During the construction of the N.J. Turnpike\u2019s western spur in 1969, a portion of this site was used as a dewatering basin for the sand fill used to construct the turnpike.\u00a0 Construction of the mitigation bank and site, restoration of tidal inundation and planting of the site with <em>Spartina alterniflora<\/em> was completed in 2012.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Existing Site-Specific Data Inventory<\/strong><\/p>\n<ol>\n<li><strong> Survey, Maps, and GIS<\/strong><\/li>\n<\/ol>\n<p>HMD regional data exists inclusive of this site.<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li><strong> Real Estate\/Ownership<\/strong><\/li>\n<\/ol>\n<p>Transcontinental Gas Pipe Line Company (Transco) and Evergreen Environmental, LLC (Lot 5)<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li><strong> Site History &amp; Land Use<\/strong><\/li>\n<\/ol>\n<p>Site history and land use were discussed in the 2011 Mitigation Banking Instrument.<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li><strong> Biological Studies &#8211; Fauna<\/strong><\/li>\n<\/ol>\n<p>Biological studies were discussed in the 2011 Mitigation Banking Instrument.<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li><strong> Biological Studies &#8211; General Environmental<\/strong><\/li>\n<\/ol>\n<p>General environmental information can be found in the 2011 Mitigation Banking Instrument.<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li><strong> Geotechnical<\/strong><\/li>\n<\/ol>\n<p>Pre-restoration studies were conducted in 2004 and 2005.<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li><strong> Hydraulics and Hydrology<\/strong><\/li>\n<\/ol>\n<p>Hydrology was studied in 1996, 1998 and 2005.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>H.Water and Sediments<\/strong><\/p>\n<p>Water quality was measured in 1984, 1985, 2004 and 2005.\u00a0 Sediment studies were conducted in 2004, 2005 and 2010.<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li><strong> Historical\/Cultural Resources<\/strong><\/li>\n<\/ol>\n<p>Historical\/Cultural resources were discussed in the 2011 Mitigation Banking Instrument.<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li><strong> Restoration\/Remediation Design Plans<\/strong><\/li>\n<\/ol>\n<p>Restoration design plans were presented in the 2011 Mitigation Banking Instrument.<\/p>\n<p><strong>Site Reports<\/strong><\/p>\n<p><strong>Site A \u2013 <\/strong><strong>MRI Phase 3 Mitigation Bank and Global Mitigation Site<\/strong><\/p>\n<p><strong>Category<\/strong>: Existing Restoration\/Preservation and\/or Mitigation Site<\/p>\n<p><strong>Location<\/strong>: Bounded on the north by the Transco pipeline, on the south by the Hackensack River, on the west by Bashes Creek, and on the east Transco\u2019s Station 240 LNG facility.\u00a0 The MRI Phase 3 wetland mitigation bank lies between Bashes and Moonachie Creeks.\u00a0 The Global wetland mitigation site is between Moonachie Creek and the uplands of the Transco Station 240 LNG facility.<\/p>\n<p><strong>Latitude\/Longitude<\/strong>: 40.81110 \/ -74.05496<\/p>\n<p><strong>Current Land Use<\/strong>: Tidal Wetland Mitigation Bank and Wetland Mitigation Site<\/p>\n<p><strong>Size<\/strong>: 67 acres total; MRI Phase 3 Mitigation Bank is 51 acres.\u00a0 The adjacent Global mitigation site is 16 acres.<\/p>\n<p><strong>Current Ownership<\/strong>: Transcontinental Gas Pipe Line Company (Transco) and Evergreen Environmental, LLC (Lot 5)<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Site Description<\/strong>: Prior to restoration, this site was a <em>Phragmites<\/em>-dominated freshwater wetland that was cut-off from tidal flow due to a riverfront dike and a tide gate near the mouth of Moonachie Creek that were constructed by the Bergen County Mosquito Commission circa 1934.\u00a0 During the construction of the N.J. Turnpike\u2019s western spur in 1969, a portion of this site was used as a dewatering basin for the sand fill used to construct the turnpike.\u00a0 Construction of the mitigation bank and site, restoration of tidal inundation and planting of the site with <em>Spartina alterniflora<\/em> was completed in 2012.<\/p>\n<p><strong>Existing Site Specific Data Inventory<\/strong><\/p>\n<p>* \u2013 Report repeated under multiple data categories and\/or sites.<\/p>\n<ol>\n<li><strong> Survey, Maps, and GIS<\/strong><\/li>\n<\/ol>\n<p>Relevant survey, mapping, and GIS data for the Meadowlands can be found in the Meadowlands-wide site report under data category A.<\/p>\n<ol>\n<li><strong> Real Estate\/Ownership<\/strong><\/li>\n<\/ol>\n<p>Transcontinental Gas Pipe Line Company (Transco) and Evergreen Environmental, LLC (Lot 5)<\/p>\n<ol>\n<li><strong> Site History &amp; Land Use<\/strong><\/li>\n<\/ol>\n<p><strong>*Evergreen Environmental, LLC.\u00a0 Executed Mitigation Banking Instrument for the Evergreen MRI3 Mitigation Bank. December 2011.<\/strong>\u00a0 Establishes guidelines and responsibilities for the establishment, use, operation and maintenance of the Evergreen MRI3 Mitigation Bank. Includes a baseline conditions report, which consists of information on ownership, site history\/land use, cultural resources, hydrology, soils, vegetation, wetlands, and wildlife, as well as a wetland delineation map. Contains an existing condition topographic survey (2011) and proposed mitigation design plans (2011).<\/p>\n<ol>\n<li><strong> Biological Studies \u2013 Fauna<\/strong><\/li>\n<\/ol>\n<p><strong>*Evergreen Environmental, LLC.\u00a0 Executed Mitigation Banking Instrument for the Evergreen MRI3 Mitigation Bank. December 2011.<\/strong>\u00a0 Establishes guidelines and responsibilities for the establishment, use, operation and maintenance of the Evergreen MRI3 Mitigation Bank. Includes a baseline conditions report, which consists of information on ownership, site history\/land use, cultural resources, hydrology, soils, vegetation, wetlands, and wildlife, as well as a wetland delineation map. Contains an existing condition topographic survey (2011) and proposed mitigation design plans (2011).<\/p>\n<ol>\n<li><strong> Biological Studies \u2013 General Environmental<\/strong><\/li>\n<\/ol>\n<p><strong>*Evergreen Environmental, LLC.\u00a0 Executed Mitigation Banking Instrument for the Evergreen MRI3 Mitigation Bank. December 2011.<\/strong>\u00a0 Establishes guidelines and responsibilities for the establishment, use, operation and maintenance of the Evergreen MRI3 Mitigation Bank. Includes a baseline conditions report, which consists of information on ownership, site history\/land use, cultural resources, hydrology, soils, vegetation, wetlands, and wildlife, as well as a wetland delineation map. Contains an existing condition topographic survey (2011) and proposed mitigation design plans (2011).<\/p>\n<ol>\n<li><strong> Geotechnical <\/strong><\/li>\n<\/ol>\n<p><strong>*Evergreen Environmental, LLC.\u00a0 Executed Mitigation Banking Instrument for the Evergreen MRI3 Mitigation Bank. December 2011.<\/strong>\u00a0 Establishes guidelines and responsibilities for the establishment, use, operation and maintenance of the Evergreen MRI3 Mitigation Bank. Includes a baseline conditions report, which consists of information on ownership, site history\/land use, cultural resources, hydrology, soils, vegetation, wetlands, and wildlife, as well as a wetland delineation map. Contains an existing condition topographic survey (2011) and proposed mitigation design plans (2011).<\/p>\n<ol>\n<li><strong> Hydraulics and Hydrology<\/strong><\/li>\n<\/ol>\n<p><strong>*Evergreen Environmental, LLC.\u00a0 Executed Mitigation Banking Instrument for the Evergreen MRI3 Mitigation Bank. December 2011.<\/strong>\u00a0 Establishes guidelines and responsibilities for the establishment, use, operation and maintenance of the Evergreen MRI3 Mitigation Bank. Includes a baseline conditions report, which consists of information on ownership, site history\/land use, cultural resources, hydrology, soils, vegetation, wetlands, and wildlife, as well as a wetland delineation map. Contains an existing condition topographic survey (2011) and proposed mitigation design plans (2011).<\/p>\n<ol>\n<li><strong> Water and Sediments<\/strong><\/li>\n<\/ol>\n<p><strong>*Evergreen Environmental, LLC.\u00a0 Executed Mitigation Banking Instrument for the Evergreen MRI3 Mitigation Bank. December 2011.<\/strong>\u00a0 Establishes guidelines and responsibilities for the establishment, use, operation and maintenance of the Evergreen MRI3 Mitigation Bank. Includes a baseline conditions report, which consists of information on ownership, site history\/land use, cultural resources, hydrology, soils, vegetation, wetlands, and wildlife, as well as a wetland delineation map. Contains an existing condition topographic survey (2011) and proposed mitigation design plans (2011).<\/p>\n<ol>\n<li><strong> Historical\/Cultural Resources<\/strong><\/li>\n<\/ol>\n<p><strong>*Evergreen Environmental, LLC.\u00a0 Executed Mitigation Banking Instrument for the Evergreen MRI3 Mitigation Bank. December 2011.<\/strong>\u00a0 Establishes guidelines and responsibilities for the establishment, use, operation and maintenance of the Evergreen MRI3 Mitigation Bank. Includes a baseline conditions report, which consists of information on ownership, site history\/land use, cultural resources, hydrology, soils, vegetation, wetlands, and wildlife, as well as a wetland delineation map. Contains an existing condition topographic survey (2011) and proposed mitigation design plans (2011).<\/p>\n<ol>\n<li><strong> Restoration\/Remediation Design Plans<\/strong><\/li>\n<\/ol>\n<p><strong>*Evergreen Environmental, LLC.\u00a0 Executed Mitigation Banking Instrument for the Evergreen MRI3 Mitigation Bank. December 2011.<\/strong>\u00a0 Establishes guidelines and responsibilities for the establishment, use, operation and maintenance of the Evergreen MRI3 Mitigation Bank. Includes a baseline conditions report, which consists of information on ownership, site history\/land use, cultural resources, hydrology, soils, vegetation, wetlands, and wildlife, as well as a wetland delineation map. Contains an existing condition topographic survey (2011) and proposed mitigation design plans (2011).<\/p>\n<p><strong>K. Bibliographic Updates\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; \u00a0 \u00a0 \u00a0MRI Phase 3 Mitigation Bank \u00a0 \u00a0 \u00a0Global Terminal &amp; Container Services Mitigation Site &nbsp; A. \u00a0 \u00a0 \u00a0MRI Phase 3 Wetland Mitigation Bank and Global Terminal &amp; Container Services, LLC Mitigation Site\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 Category: Existing Restoration\/Preservation and\/or Mitigation Site Location: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":53,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"class_list":["post-1439","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/pages\/1439","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/comments?post=1439"}],"version-history":[{"count":5,"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/pages\/1439\/revisions"}],"predecessor-version":[{"id":1624,"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/pages\/1439\/revisions\/1624"}],"up":[{"embeddable":true,"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/pages\/53"}],"wp:attachment":[{"href":"https:\/\/meri.njmeadowlands.gov\/mesic\/wp-json\/wp\/v2\/media?parent=1439"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}